Decommissioning & Pipework Upgrades
Safe decommissioning of redundant gas and mechanical pipework systems, and full pipework upgrade programmes — replacing ageing or non-compliant installations with new, regulation-compliant systems.
Decommissioning redundant gas and mechanical systems requires careful planning, the right accreditations and thorough documentation. BLG Engineering Ltd manages the full process — from initial survey and method statement through to safe isolation, purging, removal and sign-off.
What We Cover
- Gas Safe registered decommissioning engineers
- Safe purging, isolation & capping
- Coordination with gas network operators
- Mechanical pipework decommissioning
- Full pipework upgrade & replacement
- Compliance documentation & sign-off
Gas System Decommissioning
We safely decommission redundant gas installations including mains, distribution pipework, appliances and plant. All work is carried out by Gas Safe registered engineers following approved procedures, with full purging, isolation and capping to current IGEM standards. We coordinate with gas network operators where disconnection of the supply is required.
Mechanical Pipework Decommissioning
We decommission redundant mechanical pipework systems including heating, cooling, compressed air and process pipework. We drain, isolate, cap and remove redundant systems in a controlled manner, minimising disruption to live services and providing full documentation on completion.
Pipework Upgrade Programmes
Where existing pipework is ageing, non-compliant or no longer fit for purpose, we design and install replacement systems to current standards. We manage the transition from old to new, maintaining continuity of supply where required and providing full compliance documentation on handover.